Gold Mine TSF Stabilization QC

Client

Arthon Constructors Corporation

Schedule

2022-2023

Location

British Columbia

Services

  • Materials Testing
  • Survey

Sector

  • Mining

Project Details

Since February 2022, Inline has been supporting Arthon Industries Limited at an inactive gold mine in the Rocky Mountains, providing critical assistance during the maintenance and construction phase. The primary focus of the project has been the excavation of an emergency spillway, along with the placement of geotextile and multiple layers of screened fill. While operating in remote and often challenging conditions, including wildfire-related evacuations, Inline’s teams demonstrated exceptional adaptability and commitment, working day and night at peak manpower. The project was completed without a single safety incident, underscoring the strong collaboration, communication, and safety culture upheld throughout the project.

Inline’s scope of services encompassed a robust range of technical and field support offerings tailored to the needs of this complex site. These included compaction and soil testing, aggregate testing, plate load testing, and construction monitoring to ensure material integrity and performance. Survey services were integral, covering control establishment and monitoring, layout and as-built surveys, volume and quantity tracking, and QAQC survey management. Additional support—such as pre-job scouting, settlement monitoring, machine control assistance, and AutoCAD design services—ensured smooth execution and real-time adaptability across all phases of work.

Services Executed

  • Compaction & Soil Testing
  • Aggregate Testing
  • Construction Monitoring
  • Plate Load Testing
  • Control Establishment & Monitoring
  • Pre-Job Scouting/Site Assessment
  • Survey Support, Layouts & As-Builts
  • Volume & Quantities Tracking
  • Machine Control Support
  • QAQC Surveys & Management
  • Settlement Monitoring
  • AutoCAD Support & Design

Similar Projects

Rainy River Mine project
Rainy River Mine

The Rainy River Mine, situated about 65 kilometers northwest of Fort Frances, Ontario, is a major gold and silver mining operation that began production in 2017.

Learn More
Cascade power plant project
Cascade Power Plant

The Cascade Power Project is a 900-megawatt combined cycle power generation facility under construction in Yellowhead County, Alberta, located roughly 12 kilometres southwest of Edson.

Learn More
HR Milner Phase 2 project
HR Milner Phase 2 Power Plant

The Milner 2 Power Plant, located at the HR Milner Generating Station near Grande Cache, Alberta, is a 204 MW natural gas-fired turbine generator and stands as the largest simple cycle facility of its kind in the province.

Learn More