Blackwater Gold Mine

Client

Bird Construction

Schedule

2023-2025

Location

British Columbia

Services

  • Survey

Sector

  • Mining

Project Details

The Blackwater Mine Project is a large-scale open-pit gold and silver operation in central British Columbia, located approximately 110 km south of Vanderhoof. Designed with processing facilities capable of handling 60,000 tonnes of ore per day, the project has a projected mine life of 17 years. Representing one of the most significant capital investments in the Bulkley-Nechako, Fraser-Fort George, and Cariboo regions in the last decade, the mine is positioned as a transformative development for the province’s mining sector.

Inline has been involved since the early development phases, beginning in 2022 with specialized bush flagging services for Artemis Gold. This early scope required advanced safety training and extensive snowmobile travel to navigate remote terrain during clearing operations. As construction advanced, Inline’s role expanded significantly, supporting Bird Construction with survey services for civil and concrete scopes. Our team provided high-precision layout and verification for the development of processing infrastructure, ensuring accuracy and compliance with project specifications. Inline’s proven reliability and consistent performance led to additional contracts from other clients engaged on the Blackwater project, reflecting the quality of the work performed and the trust earned on site. Throughout the project, our crews maintained a strong commitment to safety and environmental stewardship while commuting up to three hours daily on remote logging roads to meet demanding construction schedules.

Services Executed

  • Control Establishment
  • Survey Support & Topographical Surveys
  • Volume & Quantities Tracking
  • AutoCAD & GIS Support

Similar Projects

LNGC Piling project
LNGC Plant & Export Terminal Piling

Inline played a vital role as the survey contractor for SB Canada on the LNG Canada (LNGC) project in Kitimat, BC—a monumental effort to construct a massive liquefied natural gas plant and export terminal.

Learn More
Woodworth Dam project
Woodworth Dam Replacement Project

The Woodworth Dam Replacement Project is a major water infrastructure initiative undertaken by the City of Prince Rupert to replace the original dam structure built in 1912.

Learn More
Tawatina Bridge project
Tawatina LRT Bridge

The Tawatina Bridge was a key component of the 13-kilometre first phase of the Edmonton Valley Light Rail Transit project. Designed as a cable-stayed, concrete box girder bridge with a pedestrian walkway, it spanned the North Saskatchewan River in three sections.

Learn More