Magino Gold Mine

Client

Sigfusson Northern

Schedule

2021-2025

Location

Ontario

Services

  • Survey
  • UAV

Sector

  • Mining

Project Details

The Magino Gold Project, now owned by Alamos Gold, is a large-scale open-pit mining operation in northern Ontario. With an estimated 63.3 million tonnes of proven and probable reserves at an average gold grade of 1.16 g/t (approximately 2.36 million ounces of contained gold), the mine is positioned as a major contributor to gold production in the region, with operations expected to extend through 2041.

Inline played a central role in the development of the Magino site, providing full-service survey, UAV, and construction support throughout the project. Our team designed and laid out more than 25,000 drill and blast holes across haul roads, creek diversions, plant sites, borrow sources, and pit development. Customized blast patterns were developed to match material requirements and blaster preferences, while strict safety protocols were implemented, including blast radius offsets and minimum drill depths. Inline also issued pre and post-blast notifications, determined subdrill lengths, and tracked excavation volumes to maintain accuracy and safety standards.

In addition to drill and blast operations, Inline supported earthworks and infrastructure construction, delivering survey design, layout, and as-built services for Water Quality Control Ponds and over 6 km of Tailings Management Facilities (TMF) built with more than 2 million cubic metres of material. Our crews also executed surveys for dams, collection ditches, tailings and reclaim corridors, and other essential infrastructure across the site.

Comprehensive data management and quality control formed a key part of our work, with Inline producing detailed drill and blast packages, drillers’ instructions, and blast zone buffer plans. We also prepared volume and quantity tracking reports, payment-ready drill length reports, and performed ongoing quality control verification. On and off-site AutoCAD support ensured seamless design integration and real-time updates. Complementing these efforts, our UAV specialists conducted aerial mapping, progress photography, and video documentation, providing critical visualization for project tracking and client reporting.

Services Executed

  • Survey Support, Layouts & As-Builts
  • On-Site Quality Control
  • Volume & Quantities Tracking
  • UAV Mapping, Photos & Videos
  • Blast Zone Buffer Plans & Drill Packages
  • Safety Planning Support for Blasting
  • AutoCAD Design & Remote Support

Similar Projects

LNGC Piling project
LNGC Plant & Export Terminal Piling

Inline played a vital role as the survey contractor for SB Canada on the LNG Canada (LNGC) project in Kitimat, BC—a monumental effort to construct a massive liquefied natural gas plant and export terminal.

Learn More
LNGC Cedar Valley Lodge project
LNGC Cedar Valley Lodge

Cedar Valley Lodge (CVL) is a purpose-built workforce accommodation facility developed to support the LNG Canada project in Kitimat, British Columbia. Designed to house up to 4,500 workers, the lodge spans more than 1.2 million square feet—roughly the size of 21 football fields—and includes a full suite of amenities such as dining areas, fitness facilities, and recreational spaces.

Learn More
Highway 29 Halfway River Bridge project
Highway 29 Halfway River Bridge

The Highway 29 Realignment and Bridge Replacement project, part of BC Hydro’s Site C Clean Energy Project, involved a significant $104.6-million investment to improve transportation infrastructure in northeastern British Columbia.

Learn More