Project Details
The Rainy River Mine, located approximately 65 km northwest of Fort Frances, Ontario, is a large-scale gold and silver mining operation that began production in 2017. Featuring both open-pit and underground components, the site has undergone significant infrastructure development to sustain long-term production. A key initiative included the construction of a tailings dam, which enhanced operational efficiency while meeting stringent environmental stewardship requirements.
Inline partnered with Ledcor CMI to deliver a full suite of survey and geotechnical services during the tailings dam construction phase, ensuring precision, safety, and efficiency under demanding conditions. Our survey work included layout and control for the dam, spillway, and supporting infrastructure—such as hydraulic structures, haul roads, borrow areas, and disposal sites. Inline also deployed a CCIL Aggregate Certified mobile laboratory to provide rapid, on-site soil and aggregate testing, performing proof roll inspections, compaction verification, and detailed results analysis to maintain quality and regulatory compliance. At peak activity, a dedicated team of seven employees provided 24/7 coverage to support continuous construction efforts. Our AutoCAD specialists offered design services and data integration, producing comprehensive report packages and turnovers for project documentation and client handover.
Services Executed
- Survey Layout & Control
- Soil & Aggregate Testing
- AutoCAD Support & Design
- Mobile Laboratory Supply
- Proof Roll Inspections
- Analysis of Results & Report Preparation
- Comprehensive Package Turnovers
Similar Projects

New AUPE Headquarters
The AUPE Headquarters project is a distinctive, LEED Silver-certified office development located in Edmonton, Alberta. Spanning approximately 125,000 square feet, the new headquarters for the Alberta Union of Provincial Employees (AUPE) features a four-storey modular design consisting of four interconnected wings of varying floor heights, joined by floating staircases.

LNGC Plant & Export Terminal Piling
Inline played a vital role as the survey contractor for SB Canada on the LNG Canada (LNGC) project in Kitimat, BC—a monumental effort to construct a massive liquefied natural gas plant and export terminal.

Jansen Potash Mine
The Jansen Potash Project, located approximately 140 kilometres east of Saskatoon, is a landmark CAD$7.5 billion investment by BHP in its first stage alone.