Inline Group is working as a survey contractor for Bird Construction during their work on constructing the non-process buildings on a major gas project in Kitimat, BC. The buildings being constructed include administrative buildings, warehouses, labs, change lockers and more.

Inline’s role in the project is a multi phased approach. Ground stability load testing is the first phase of the project scope to ensure building footprints meet engineering requirements for safe erection of the buildings. Settlement gauges are positioned and continuously monitored with high precision levels to track settling that occurs in these areas.

Phase two will include the construction survey of the buildings and supporting underground utility networks.  Extremely large quantities of concrete and formwork will make up much of this phase.

Services Executed:

  • Control Establishment & Monitoring

  • Settlement Gauge Layout & Monitoring

  • Pile Layout & As-builts

  • Earthworks Layout

  • Survey Support & Topographical Survey

  • Aerial Mapping & Monitoring